Concrete Line Pump Pricing – Toronto & GTA

Most concrete pumping companies make you call before you know what a pour will cost. We publish our rates. You know the price before the trucks are ordered, and there are no surprise charges on the invoice.
Our Rates
| Service | Price |
|---|---|
| First hour of pumping – includes travel to your site, setup, line priming, washout and travel back | $800 |
| Minimum booking – every job is billed for at least the first hour | 1 hour |
| Each additional hour of pumping | $200 / hour |
| Long-distance travel – job sites more than 100 km from our yard (146 Citation Drive, Vaughan) | $1 / km beyond the first 100 km |
| HST | 13% added to all prices |
What Is Included in the First Hour
- Travel from our yard to your job site and back
- Pump setup and line layout
- Line priming before the first truck
- The first hour of pumping
- Washout and cleanup of the pump and lines
- An experienced pump operator
Example Costs
| Job | Typical pumping time | Estimated cost (before HST) |
|---|---|---|
| Basement floor, Toronto semi | 1 hour | $800 |
| Footings for an addition | 1–2 hours | $800 – $1,000 |
| Backyard patio or pool deck | 2 hours | $1,000 |
| Foundation walls / ICF | 3 hours | $1,200 |
Pumping time depends mostly on how quickly the ready-mix trucks arrive and how fast your crew places and finishes the concrete. Tell us the volume and the layout of the site and we will give you a firm estimate.
How to Keep the Cost Down
- Schedule the ready-mix trucks back-to-back so the pump does not sit waiting.
- Order a pump mix (pea gravel or 3/8″ stone) from the plant – it moves faster and reduces the risk of blockages.
- Have forms, rebar and your finishing crew ready before the pump arrives.
- Clear a path for the line and a spot for the trucks next to the pump.
Not sure how much concrete you need? Send us the dimensions and we will calculate the volume for you.