Footings, Foundations & ICF Pumping

Concrete Pumping for Footings, Foundation Walls & ICF

Concrete pumped into a footing with rebar

Forming and foundation crews need concrete placed steadily and evenly – especially in walls and ICF, where lifts must be controlled to protect the forms. Our line pump gives your crew a hose they can move along the forms at a controlled rate, from the street to the back of the lot.

Jobs We Pump

  • Strip footings and pad footings
  • Foundation walls for additions, garden suites and laneway houses
  • ICF walls – controlled lifts with a reducer hose
  • Block fill and bond beams
  • Sonotubes, piers and deck footings
  • Retaining walls
  • Footings and walls on commercial and multi-unit projects

Why Forming Contractors Use a Line Pump

  • Reach the whole footprint from one setup – no truck driving on the excavation edge.
  • Steady, controllable flow for ICF and tall walls.
  • Fewer workers needed on the pour.
  • Ideal for tight infill lots in Toronto where a boom truck can’t set up.

Price

$800 for the first hour (travel, setup and washout included), then $200 per hour. A typical footing pour takes 1–2 hours of pumping; walls and ICF usually 2–4 hours. Full pricing.