Concrete Pumping for Footings, Foundation Walls & ICF

Forming and foundation crews need concrete placed steadily and evenly – especially in walls and ICF, where lifts must be controlled to protect the forms. Our line pump gives your crew a hose they can move along the forms at a controlled rate, from the street to the back of the lot.
Jobs We Pump
- Strip footings and pad footings
- Foundation walls for additions, garden suites and laneway houses
- ICF walls – controlled lifts with a reducer hose
- Block fill and bond beams
- Sonotubes, piers and deck footings
- Retaining walls
- Footings and walls on commercial and multi-unit projects
Why Forming Contractors Use a Line Pump
- Reach the whole footprint from one setup – no truck driving on the excavation edge.
- Steady, controllable flow for ICF and tall walls.
- Fewer workers needed on the pour.
- Ideal for tight infill lots in Toronto where a boom truck can’t set up.
Price
$800 for the first hour (travel, setup and washout included), then $200 per hour. A typical footing pour takes 1–2 hours of pumping; walls and ICF usually 2–4 hours. Full pricing.
